Wire and gear prices move every week
Copper, wire and switchgear are priced by the quote, and a number from last month's price sheet can take the margin out of the job.
The estimator · For electrical contractors
PLMBR's estimator works the way an electrical contractor's estimating desk does. Invitations to bid are checked against the work you take, and the drawings requested. Drawings are filed by revision, and every quantity, from fixtures and devices to panels, is measured from the sheets and traced back to them. The bid is priced with your labor rates, this week's prices from your own suppliers and your markup. When an addendum adds circuits or moves a panel, the scope is re-measured and the bid revised. Every bid is followed up until it's awarded or declined, and approved changes are written up as change orders.
Copper, wire and switchgear are priced by the quote, and a number from last month's price sheet can take the margin out of the job.
Fixtures, receptacles, switches and panels have to be counted across every sheet, and one missed page is work you do for free.
A revised lighting plan or an added circuit changes the quantities, and a count from last week's set is a wrong number.
The same week can bring bids for several projects, each with its own forms and deadline, and a late bid is no bid.
An invitation to bid is checked against the work you take, and the drawings and specs requested.
A new revision or addendum is filed and the one before it marked superseded, so nobody prices from the old set.
Fixtures, devices, panels and every other quantity are measured from the drawings, each traced back to its sheet so you can check it.
Wire, gear and fixture costs come from your suppliers' own sites and this week's quotes, not last quarter's.
Your labor rates, your suppliers and your markup.
Your overhead and target margin are built into every estimate, and each accepted proposal teaches it your real prices.
An addendum that adds circuits or moves a panel becomes a re-measured scope and a new revision of the bid.
Say a rule the way you'd say it, like "price fire alarm as a separate line", and it holds on every bid after.
Each bid is followed up until it's awarded, declined or clearly dead.
An approved change is written up and sent for signature, kept apart from field tasks and possible changes.
Each of these is one of the things PLMBR's office does every day. See everything it does.
Sample calls and threads, start to finish. In a call, click a line to jump to it.
Sample call. The voices are generated; the office's voice is the one PLMBR's company line uses.
Yes. Quantities are measured from the drawings, fixtures, devices and panels included, each traced back to its sheet so you can check it, and the takeoff becomes a materials list priced with your suppliers.
From your own suppliers: their sites and the quotes they send this week, never a number it made up. Your labor rates and markup go on top, and each accepted bid teaches it your real prices.
It's filed with the drawings and the set before it is marked superseded. The changed scope is re-measured and the bid revised, so nobody prices from the old set.
No. Keep your current systems and PLMBR operates alongside them, or move the workflows you choose into PLMBR's own workspace, one at a time.
Ask the assistant anything about PLMBR, or let it set up a time with the team.